Focal Point
[SOLVED] Data Migrator: how to schedule process flow to run twice daily

This topic can be found at:
https://forums.informationbuilders.com/eve/forums/a/tpc/f/1381057331/m/9217029176

July 28, 2014, 04:23 PM
David Nguyen
[SOLVED] Data Migrator: how to schedule process flow to run twice daily
In Data Migrator, we can schedule a process flow to run once daily at a specific time.

For example:
-**Scheduler Type : Recurring; Continuous Type.
-**Schedule Interval : Every 01 Day(s).
-**Scheduler Start : 2014/07/31 07:30:00
-**Intraday Start : 00:00:00
-**Intraday End : 00:00:00
-**Log Destinations : ETLLOG, E-Mail

How can we schedule the process flow to run twice daily at 7:30 AM and 1:30 PM?
Thanks for your suggestion.

This message has been edited. Last edited by: Tamra,


iWay Data Migrator v7704M
Windows, All Outputs
July 29, 2014, 06:36 AM
Martin vK
Hi David,

Have you tried to set the Interval Type to Hourly and Interval Value to 5 (the time between 7:30AM and 1:30PM).
And then Intraday Start at 7:30AM and Intraday End to 2:00PM. The last value should be at least 1:30PM, but I am not sure if it will still start, and should not be later than 1:30PM + 5 hours to prevent a third start.

The documentation is indeed not very clear on these cases.

regards, Martin.


WebFocus 8206M, iWay DataMigrator, Windows, DB2 Windows V10.5, MS SQL Server, Azure SQL, Hyperstage, ReportCaster
July 29, 2014, 08:23 AM
Alex
In the Advanced settings you can repeat the schedule every X minutes or x hours. Set it to repeat every 6 hours after your start time of 7:30 AM until 1:31 PM.


WF 7.7.04, WF 8.0.7, Win7, Win8, Linux, UNIX, Excel, PDF
July 29, 2014, 11:15 AM
David Nguyen
Thanks Martin and Alex for your tips.


iWay Data Migrator v7704M
Windows, All Outputs