Focal Point Banner


As of December 1, 2020, Focal Point is retired and repurposed as a reference repository. We value the wealth of knowledge that's been shared here over the years. You'll continue to have access to this treasure trove of knowledge, for search purposes only. Moving forward, myibi is our community platform to learn, share, and collaborate. We have the same Focal Point forum categories in myibi, so you can continue to have all new conversations there. If you need access to myibi, contact us at myibi@ibi.com and provide your corporate email address, company, and name.


Connect to myibi
Focal Point    Focal Point Forums  Hop To Forum Categories  iWay Software Product Forum on Focal Point    [SOLVED] Data Migrator: how to schedule process flow to run twice daily

Read-Only Read-Only Topic
Go
Search
Notify
Tools
[SOLVED] Data Migrator: how to schedule process flow to run twice daily
 Login/Join
 
Member
posted
In Data Migrator, we can schedule a process flow to run once daily at a specific time.

For example:
-**Scheduler Type : Recurring; Continuous Type.
-**Schedule Interval : Every 01 Day(s).
-**Scheduler Start : 2014/07/31 07:30:00
-**Intraday Start : 00:00:00
-**Intraday End : 00:00:00
-**Log Destinations : ETLLOG, E-Mail

How can we schedule the process flow to run twice daily at 7:30 AM and 1:30 PM?
Thanks for your suggestion.

This message has been edited. Last edited by: Tamra,


iWay Data Migrator v7704M
Windows, All Outputs
 
Posts: 23 | Registered: January 29, 2014Report This Post
Platinum Member
posted Hide Post
Hi David,

Have you tried to set the Interval Type to Hourly and Interval Value to 5 (the time between 7:30AM and 1:30PM).
And then Intraday Start at 7:30AM and Intraday End to 2:00PM. The last value should be at least 1:30PM, but I am not sure if it will still start, and should not be later than 1:30PM + 5 hours to prevent a third start.

The documentation is indeed not very clear on these cases.

regards, Martin.


WebFocus 8206M, iWay DataMigrator, Windows, DB2 Windows V10.5, MS SQL Server, Azure SQL, Hyperstage, ReportCaster
 
Posts: 168 | Registered: March 29, 2013Report This Post
Platinum Member
posted Hide Post
In the Advanced settings you can repeat the schedule every X minutes or x hours. Set it to repeat every 6 hours after your start time of 7:30 AM until 1:31 PM.


WF 7.7.04, WF 8.0.7, Win7, Win8, Linux, UNIX, Excel, PDF
 
Posts: 175 | Location: Pomona, NY | Registered: August 06, 2003Report This Post
Member
posted Hide Post
Thanks Martin and Alex for your tips.


iWay Data Migrator v7704M
Windows, All Outputs
 
Posts: 23 | Registered: January 29, 2014Report This Post
  Powered by Social Strata  

Read-Only Read-Only Topic

Focal Point    Focal Point Forums  Hop To Forum Categories  iWay Software Product Forum on Focal Point    [SOLVED] Data Migrator: how to schedule process flow to run twice daily

Copyright © 1996-2020 Information Builders