hello I want to break for weeks and get the subtotal in a report someone could help me please
yo quiero romper por el campo fecha y cuando lleve una semana que saque el subtotalThis message has been edited. Last edited by: Kerry,
October 22, 2008, 10:14 AM
Prarie
First please update your signature so we know what verion you are using. ** Update signature 1) Logon to Focal Point and go into your complete profile. 2) Scroll down the page until you see the “Signature” field. 3) Fill in the signature you want to use. Here is a sample to model:
Prod: WebFOCUS 5.2.3 on Win 2K/IIS 6/ISAPI Mode
4) Once all changes are made/added, scroll down to the bottom of the page and click on the Submit button.
Do you have a Week Date field? If so
BY WEEKFIELD SUBTOTAL
If you don't have a week field please post the date you have with the format.
In the spirt of Tony.
En primer lugar, por favor, actualice su firma por lo tanto sabemos lo que SF está utilizando. ** Actualización de la firma 1) Inicio de sesión de Punto Focal y entrar en su perfil. 2) Desplácese por la página hasta que vea la "firma" sobre el terreno. 3) Introducir en la firma que desee utilizar. Aquí se muestra un ejemplo de modelo a:
Prod: WebFOCUS 5.2.3 en Win 2K/IIS 6/ISAPI Modo
4) Una vez que todos los cambios se hacen / añadido, desplácese hacia abajo a la parte inferior de la página y haga clic en el botón Enviar.
¿Tiene usted una Semana campo Fecha? Si es así
BY WEEKFIELD SUBTOTAL
Si no dispone de una semana después sobre el terreno por favor la fecha en la que tenemos con el formato
October 22, 2008, 10:49 AM
Tony A
Prarie,
I'm impressed
T
In FOCUS since 1986
WebFOCUS Server 8.2.01M, thru 8.2.07 on Windows Svr 2008 R2
WebFOCUS App Studio 8.2.06 standalone on Windows 10