January 16, 2009, 12:06 PM
simbaRC - secondary run interval
We have RC jobs that run hourly everyday from 6:30 AM - 6:30 PM. We set them up as daily jobs using a secondary run interval of every 1 hour. We have found that if you go into the job and change the Notifications (on the Settings tab) to have notifications sent out On Error - that after you save the job, the Next Run Time shows the next day at 6:30 AM instead of the next hourly run for the current day. Consequently, the remaining jobs for that day do not run.
Has anyone seen this? I've searched on IBI's tech site and on Focal Point and I haven't seen anything about this. We are using WF 7.6.1 on Windows.
Thanks in advance. simba
January 16, 2009, 12:10 PM
GinnyJakesIf you think this is a bug and you can reproduce it, you should open a case with IBI.
January 16, 2009, 12:42 PM
simbaI have been able to duplicate this issue multiple times. I was considering doing a ticket, but I wanted to post it here first. I have had great results posting issues here and entering an IBI ticket is my last resort. simba
January 16, 2009, 12:47 PM
GinnyJakesYes, but if it a bug, it will not get fixed on the Forum.
January 16, 2009, 02:05 PM
FrankDutchSimba
I have found this too, I do not know if it is a bug. That depends on the original requirements. I would support a change but I also think that won't be an easy one.