Focal Point
[Sharing] MR Standard Reports not schedulable in ReportCaster

This topic can be found at:
https://forums.informationbuilders.com/eve/forums/a/tpc/f/7971057331/m/4237069036

May 21, 2013, 12:30 PM
nd
[Sharing] MR Standard Reports not schedulable in ReportCaster
I was connecting a new ReportCaster installation to an existing repository (from the same WF version.)

When I attempted to create new schedules, Standard Reports were not an option.

THere was also this puzzling message in dialogs for existing schedules when I attempted to open them and in the logs when I ran them:
 ReportCaster is configured not to allow schedules with the standard report to modify 


I found nothing in tech support site or Focal Point with that error, so I though I'd post here for others.

I knew it had to be something simple... and with some help from IBI, we found it. Standard Reports were not checked in Schedule Task list.



WF: WebFocus 7.7.03
Data: Oracle, MSSQL, DB2
OS: Windows
Output: HTML/AHTML,PDF,EXL2K FORMULA, COMT